All work
Christ the King High School

Christ the King: 30 ft rolling LED wall

Education · Charlotte, NC · 2026

A 360 sq ft (30 × 12 ft) P2.8 rolling LED wall on an engineered ground-stack platform. Students move the whole wall across the stage for plays, assemblies, games and band.

The problem

One school, one budget, four departments that all wanted a screen: theater, music, athletics and assemblies. Wooden flats were slow to build and stuck in one place.

What we installed

  • A 30 × 12 ft P2.8 LED wall on a custom rolling ground-stack platform, driven by a NovaStar VX1000.
  • Theater runs digital backdrops instead of painted flats. Coaches replay game film. The band reads sheet music off the wall instead of flipping pages.

The hard part

The wall had to move without a crew. We engineered the rolling platform so the school can reposition the full 30 ft wall themselves.

Specs

Wall size30 × 12 ft (360 sq ft)
Pixel pitchP2.8
ProcessingNovaStar VX1000
MobilityRolling ground-stack platform
ClientChrist the King High School
ScopeCustom rolling platform, Custom P2.8 wall, NovaStar VX1000, On-site commissioning
Read the press coverage (opens in a new tab)

Photos

Rigging on the 30 ft rolling LED wallDigital art on the 30 ft rolling LED wallDigital theater backdrop on the rolling LED wall
“I have been a teacher for 17 years, and this is absolutely the most unique and beneficial tool I have ever used. I can show everything so in-depth; I can lay everything out. It cuts transition times in half.”
Music Teacher, Christ the King High School

Want a build like this?

Tell us your venue and scope. We'll spec it and quote it.

Get a quote
CallText